The project consists of the furnishing materials and labor to perform certain renovations, modifications and upgrades to the existing City of Pass Christian sewage lift stations. This work includes renovations for lift stations, which may include but not be limited to: piping and pump replacement; bypass pumping; replacing valves and discharge piping; installation of bypass assemblies; construction of valve vaults; in-stallation of guide rails for pump systems; installation of water services at designated stations; replace-ment of existing wet well tops; installation of SCADA controls at designated lift stations; along with other associated site work and restoration of all disturbed facilities. Existing electrical controls will be removed and replace with new.