The monitoring services contractor, utilizing adequate experienced personnel, shall oversee the inspection of disposal and unloading sites by providing monitoring, verification of load capacity and quantities, and documentation at designated temporary disposal sites. All personnel working on this activity shall be billed at the same hourly rate. The bidder must demonstrate in the proposal documents the ability to provide adequate and properly trained personnel for this function within 24 hours of receiving a Notice to Proceed. Services of these monitors will include at a minimum each of the following: (1) completing load tickets recording debris removal contractor haulers' cubic yardage and other record keeping that may be necessary (2) signing each load ticket before permitting a truck to proceed from the check-in area to the disposal area (3) remaining in constant contact with designated debris removal management personnel (4) performing other duties as directed by designated debris removal management personnel (5) accurately measuring and calculating load hauling compartments and volume capacities in cubic yards...