MOBILIZATION 1.000 LS UNCLASSIFIED EXCAVATION (FM) 1,541.000 CY GRANULAR MATERIAL (LVM), (CLASS 3, GROUP "B") 3,302.000 CY HOT MIX ASPHALT, ST, 9.5mm 9,447.000 TON HOT MIX ASPHALT, ST, 12.5mm (BASE REPAIR) 3,051.000 TON HOT MIX ASPHALT, ST, 9.5mm (LEVELING) 40.000 TON COLD MILLING OF BITUMINOUS PAVEMENT, ALL DEPTHS 13,328.000 SY MAINTENANCE OF TRAFFIC 1.000 LS ADDITIONAL CONSTRUCTION SIGNS 0.000 SF TEMPORARY TRAFFIC STRIPE (CONTINUOUS YELLOW) (PAINT) 44,187.000 LF TEMPORARY TRAFFIC STRIPE (SKIP YELLOW) (PAINT) 5.901 MI TEMPORARY TRAFFIC STRIPE, LEGEND (PAINT) 1,780.000 LF 4" WIDE THERMOPLASTIC EDGE STRIPE (CONTINUOUS WHITE) (60 mil) 16.895 MI 4" WIDE THERMOPLASTIC TRAFFIC STRIPE (SKIP YELLOW) (90 MIL) 5.901 MI 4" WIDE THERMOPLASTIC TRAFFIC STRIPE (CONTINUOUS YELLOW) (90mil) 44,187.000 LF THERMOPLASTIC LEGEND (WHITE) (120mil) 1,780.000 LF TWO-WAY YELLOW REFLECTIVE HIGH PERFORMANCE RAISED MARKERS 785.000 EA REFLECTORIZED TRAFFIC WARNING SIGN (ENCAPSULATED LENS) 50.000 EA REFLECTORIZED TRAFFIC REGULATORY SIGN (ENCAP LENS) 33.000 EA REFLECTORIZED TRAFFIC OBJECT MARKER (ENCAPSULATED LENS) (TYPE 3) 28.000 EA REFLECTORIZED TRAFFIC WARNING SIGN W/SUPP. PLATE (ENCAP LENS) 1.000 EA