Specifications include, but are not limited to: x Site preparation x Phase III access road x Phase III cell x Sedimentation basin and outlet structure x Storm water & erosion/sedimentation control x Various other construction activities necessary to complete the work 1.2.1 SITE PREPARATION x Mobilization and demobilization of all equipment, personnel, and resources necessary to perform the work; x Dewatering and demucking (unclassified excavation) of the existing sedimentation basin (Drawing 5); x Stripping, clearing, grubbing, and demucking within the Phase III, access road, and sedimentation basin footprint as necessary to establish a suitable base surface which will be supervised and approved by the Technical Representative prior to placement of any fill material (Drawings 4 and 5); 1.2.2 ACCESS ROAD x Placement and compaction of structural fill to appropriate grades as shown on Drawing 5; x Installation of a storm water drainage culvert (Drawing 8); x Installation of an 8” road surfacing with a woven geotextile base (Drawings 6 and 7); and x Installation of turnaround pad in northwest corner of Phase III (Drawing 8). 1.2.3 CELL CONSTRUCTION x Construction of Phase III cell which includes the following components: o Construction of a suitable subgrade to given grades as shown on Drawings 5 and 7; o Construction of a 2’ recompacted clay liner to given grades (Drawings 6 and 7); and o Bonding of Phase III to Phase 1A (Drawings 6 and 7).