The contractor shall furnish all labor, materials, transportation, tools, and supervision necessary to install fiber optic cable from new building 232 (Craft) to building 230 located at Columbus AFB, Mississippi.
Contractor will:
1. Install (1) 4 inch schedule 40 PVC duct from building 232 to manhole (MH) 0620.
2. Install (1) 12 strand single mode fiber optic cable from building 232 to the ITN room in building 230.
3. Provide (1) 4'x8'x3/4” backboard, fire retarded paint, mounted at location TBD.
4. Provide (1) CISCO 2960-X network switch (WS-C2960X-24PS-L), mounted inside LAN cabinet, to accommodate up to 24 users and (1) surge protection (APC NET9RMBLK or equivalent). BRAND NAME or EQUAL
A site visit will be held on September 6th @1:30 PM CST.
Please see attached SOW for full description.