PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS ROADWAY ITEMS: QUANTITY UNIT MOBILIZATION 1.000 LS CLEARING AND GRUBBING 1.000 LS REMOVAL OF BRIDGE AT STATION 14+51 1.000 UN REMOVAL OF PAVEMENT 1,450.000 SY UNCLASSIFIED EXCAVATION (FM) 1,290.000 CY BORROW EXCAVATION (F.M.E.) (CONTRACTOR FURNISHED) (CLASS 7) 1,320.000 CY STRUCTURE EXCAVATION 700.000 CY GEOGRID, TYPE III 900.000 SY TEMPORARY STREAM DIVERSION 1.000 EA GRANULAR MATERIAL (LVM), (CLASS 9, GROUP B) 1,475.000 CY CRUSHED STONE, 610 200.000 TON SIZE II STABILIZER AGGREGATE, COARSE 250.000 CY CLASS B STRUCTURAL CONCRETE, MINOR STRUCTURES 0.252 CY 18" REINFORCED CONCRETE PIPE, CLASS III 56.000 LF 18" REINFORCED CONCRETE PIPE, END SECTION 4.000 EA RIGHT-OF-WAY MARKERS (TYPE I) 11.000 EA MAINTENANCE OF TRAFFIC 1.000 LS ADDITIONAL CONSTRUCTION SIGNS 0.000 SF EROSION CONTROL ITEMS: AGRICULTURAL LIMESTONE 2.400 TON COMMERCIAL FERTILIZER (13-13-13) 1.200 TON SEEDING 1.200 AC VEGETATIVE MATERIALS FOR MULCH 3.600 TON SOLID SODDING 200.000 SY EXCELSIOR BLANKET 450.000 SY TEMPORARY SILT FENCE (TYPE II ) (AOS 0.15-0.84) 1,500.000 LF WATTLES, 20" 300.000 LF REMOVE AND RESET RIPRAP 100.000 CY LOOSE RIPRAP, 200 LB. 200.000 TON