The project will consist of the following approximate bid items/quantities: mobilization (1 ls), maintenance of traffic (1 ls), temporary silt fence (500 lf), wattles (200 lf), clearing and grubbing (1 ls), seeding and mulching, main line (1400 lf), stone/gravel resurfacing (10 cy), select borrow material (15 cy), bituminous resurfacing (20 sy), pipeline and valve id markers (53 each), 12” pvc (cl200 water pipe line (includes tracer wire) (1400 lf), directional bored HDPE DR11 encasement for 12” HDPE DR11 waterline and roadway crossing (includes bore and encasement) (carrier pipe separate pay item), 12” HDPE DR11 carrier pipe for bored encasement (includes adapters) (120 lf), DIP fittings, MS C153 compact (460 lb), and 8” machine tap (includes valve and box) (1 each).