Specifications include, but are not limited to: . Remove all shingles and roofing material down to the roof boards and haul away. 2. Install new CDX sheathing in rotted or weathered condition near the roof leak - to be level with existing CDX sheeting. 3. Provide and install stick on ice and water winter guard roof protection - a minimum of 6ft up from roof edge. 4. Provide and install 36” strip of 15# felt, cover top half of second strip and continue to lay additional rows in this method until reaching a point 24” in from side wall, then lap 15# felt 2” - 4” per row to ridge of roof. 5. Cut open a ventilation space along the ridge of the roof and Install continuous ridge vent across the ridge of the home. Fill in the holes from the R-750 roof vents. 6. Provide and install aluminum roof drip edge.