Specifications include, but are not limited to: A. The work will done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Order any materials required for project completion. 2. Schedule with owner a weekend to remove existing storage tanks and install new Electrical Water Heater. This will provide domestic hot water for the barber shop while replacing HEX-3. 3. Remove existing Storage Tank and provide new Electric Water Heater. 4. Remove existing HEXs and replace with new HEXs. 5. Remove existing pumps and replace with new pumps. 6. Remove existing motor control center and replace with new 100A panelboard.