Specifications include, but are not limited to: Renovate a portion of 8th floor PWB for install of two sound booths. Create electrical testing space, dry lab space, and workstation space for research on improving hearing restoration. Human participants will be seen in these spaces. The renovation will include relocation of existing sound booth from Nils Hasselmo Hall (NHH). Contractor to procure second sound booth for PWB. Sound booth vendor will actually move existing booth from NHH to PWB. Contractor will be responsible for utility disconnects and reconnects of existing booth utility connects for new booth. New and relocated sound booths will need all utilities in place. Coordinate with vendor to connect. Create an electrical lab with workstations. Create an electron testing room with glass walls. Provide electrical raceway in each facility for flexibility. Create workstation space for 7 people. Customer to work with Kimball for furniture. Contractor to work with Kimball for glass walls. Replace sink in corridor. Create a reception room. Patch and paint all areas. Install carpet. Contractor will be responsible for patch/paint/corrective work at NHH to return space to original condition upon removal of the sound booth.