Specifications include, but are not limited to: Topdressing Sand - Estimated Quantity - 900 Cubic Yards Soils must be clean and free of foreign materials such as rocks, woods, roots and pesticides. ● 100% Washed Sand ● 1% or less of total sand ● 75% or more of total sand ● 20% or less of total sand ● 1.0mm in particle size ● 0.5 to 0.25mm in particle size ● 0.15mm in particle size Topdressing Sand $ /Cubic Yard Topdressing Sand $ /12 Cubic Yards Delivery Time /Hours 80/20 Green Construction Soils - Estimated Quantity -125 Cubic Yards Soils must be clean, homogenous, pulverized and free of foreign materials such as rocks, woods, roots and pesticides. ● 80 Washed Sand ○ Silt and clay content of may not exceed 3 and the PH of the sand may not exceed 7.8 nor be less than 5.5. ○ 8% or less of total sand 1.0mm in particle size ○ 75% or more of total sand 0.25 to 1.0mm in particle size ○ 20% or less of total sand 0.05 to 0.25mm in particle size ● 20 Northern Reed Sedge Peat ○ Peat shall be prescreened over a 1/8" x 1/4" screen prior to mixing with sand. ○ PH of peat must be from 4.1 to 4.8. ○ Minimum organic matter content of 85% by weight as determined by loss of ignition (ASTM 0 2974-87-Method D) The final soil mixture shall be screened a final time to a 5mm size. The PH of the final soil mixture shall not exceed 7.0 80/20 Green Construction Soils $ /Cubic Yard 80/20 Green Construction Soils $ /12 Cubic Yards Delivery Time /Hours