Loading...
Skip to main content
< Back to results

Hillcrest Tunnel Restoration at MCF Faribault


Location
Minnesota
Publication Date
07/11/2019 12:31 PM EDT
Closing Date
08/07/2019 04:00 PM EDT
Issuing Organization
State of Minnesota - Department of Administration
Solicitation Number
Description

Specifications include, but are not limited to: 1. Contractor shall install all construction fencing shown on the project documents. 2. Contractor shall perform all excavating and backfill required in the project documents. 3. Contractor is responsible for all temporary shoring of existing electrical, mechanical, and other miscellaneous utilities inside the tunnel prior to tunnel concrete lid removal. Protect all utilities during demolition and construction. 4. Contractor shall remove and replace tunnel concrete lid as indicated in the construction drawings. 5. Contractor shall patch, repair, or infill all concrete areas indicated on the construction drawings. 6. Contractor shall install new concrete end wall as indicated on the construction drawings. 7. Contractor shall install waterproofing on exterior of concrete tunnel as indicated in the construction drawings. 8. Contractor shall re-support any electrical, mechanical, or any other disturbed utilities once lid replacement is complete.

Get instant access

Get instant access to solicitation details & future business opportunities.

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Matching bid notifications & access to all Statewide & Group bid details

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Matching bid notifications from participating agencies

Group

Matching bid notifications from participating agencies

Access participating agency bids

Basic

Access participating agency bids