Specifications include, but are not limited to: 1. Pavement: Resurface the roadway by milling the existing pavement surface, performing a Cold-Inplace Recycle (CIR), and placement of a bituminous overlay. Concrete Pavement Rehabilitation (CPR) will also be completed on TH 4 near the interchange with TH 60. 2. Shoulders and Turn Lanes: Resurface the rural roadway section to include six-foot paved shoulders (for rumbles and bicycle use) from Sherburn to Ormsby. Resurface the roadway to include 2-foot paved shoulders from Ormsby to TH 60 (for installation of rumbles). Resurface all turn lanes, pave all low side of superelevation areas, and bring up low shoulders with aggregate from edge of bituminous to shoulder point of inflection (PI). 3. Sidewalk and Trail work: Construct compliant Americans with Disabilities Act (ADA) pedestrian ramps, sidewalks, & trails in Trimont and Sherburn. Construction of a new city trail along TH 4 through Trimont.