Specifications include, but are not limited to: The goal of debris diversion is to divert construction, demolition, and land cleaning debris away from landfills. The goal of the Waste Management Plan is to achieve the following: 1) Construction Waste: Minimize waste generated from construction, renovation and demolition of buildings through detailing and specifications. 2) Construction Waste: Divert at least 75% (by weight) construction, demolition, and land clearing debris from landfill disposal. The goal is to recycle materials and equipment packaging generated during construction. The recycled materials and equipment shall be documented using Worksheet M-3 Packaging Waste Recycling Economics (Appendix 5.3) (or an alternative approved reporting form). The M-3 worksheet includes: 1) A description of the packaging and operations waste diverted / recycled materials, 2) Where these materials were diverted or recycled, 3) The quantity of packaging and operations waste diverted / recycled materials (in tons or cubic yards) 4) A description of landfill material, 5) The landfill hauler or the landfill location, 6) The quantity of the landfill waste.