Loading...
Skip to main content
< Back to results

Dayton Building Controls Upgrade and Cooling Replacement at MCF Red Wing


Location
Minnesota
Publication Date
07/03/2019 12:40 PM EDT
Closing Date
08/01/2019 03:30 PM EDT
Issuing Organization
State of Minnesota - Department of Administration
Solicitation Number
Description

Specifications include, but are not limited to: 1. Replacement of the existing building automation system by extending the existing campus wide system to provide full DDC control of the existing building. 2. Replacement of a DX based cooling system for an electrical/data room. 3. Replacement of a DX based rooftop air handling unit. 4. Creation of a new chilled water cooling system with the installation of an air cooled chiller, chilled water pumps, and cooling coils. 5. Replacement of the existing water/glycol mix within the existing hydronic heater system.

Get instant access

Get instant access to solicitation details & future business opportunities.

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Matching bid notifications & access to all Statewide & Group bid details

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Matching bid notifications from participating agencies

Group

Matching bid notifications from participating agencies

Access participating agency bids

Basic

Access participating agency bids