Specifications include, but are not limited to: • Installation of any/all dust control measures to include but not limited to; plastic on floors, doors, and/or HVAC ducts to insure the protection of all furniture, equipment, surfaces and air quality from dust, demolition debris and/or equipment and personnel. • Remove all hydraulic fluid from the in-floor hoist cylinders, piping, valves and reservoir tank • Remove all in-floor hoist components including cylinders, containment pits, reservoir tank and piping under the direct supervision of a certified/licensed underground storage tank removal supervisor • Remove existing trench drain, clean cut inlets and/or outlets for installation of new trench drain • Saw cut and remove concrete. Where feasible, cut along existing expansion/control joints • Remove existing west overhead door, track, operator and controls • Remove the west overhead door rough opening non-structural framing, being careful not to remove or disturb existing structural framing