Specifications include, but are not limited to: MOBILIZATION, LUMP SUM 1.00; CLEARING, TREE 54.00; GRUBBING, TREE 57.00; REMOVE MANHOLE OR CATCH BASIN, EACH 21.00; REMOVE GATE VALVE & BOX, EACH 9.00; REMOVE CURB STOP & BOX, EACH 37.00; REMOVE HYDRANT, EACH 3.00; REMOVE SIGN, EACH 12.00; REMOVE HANDHOLE, EACH 4.00; REMOVE LIGHT FOUNDATION, EACH 27.00; SAWING CONCRETE PAVEMENT (FULL DEPTH), LIN FT 348.00; SAWING BIT PAVEMENT (FULL DEPTH), LIN FT 598.00; REMOVE WATER MAIN, LIN FT 2,195.00; REMOVE SEWER PIPE (STORM), LIN FT 771.00; REMOVE SEWER PIPE (SANITARY), LIN FT 1,461.00; REMOVE CURB & GUTTER, LIN FT 6,173.00; REMOVE CONCRETE DRIVEWAY PAVEMENT, SQ YD 118.00; REMOVE BITUMINOUS PAVEMENT, SQ YD 12,959.00; REMOVE CONCRETE SIDEWALK, SQ FT 29,224.00; GEOTEXTILE FABRIC TYPE 6, SQ YD 15,344.00; EXCAVATION - COMMON, CU YD 16,161.00; EXCAVATION - MUCK, CU YD 3,455.00; SELECT GRANULAR EMBANKMENT MOD 7% (CV), CU YD 14,002.00