Specifications include, but are not limited to:. MOBILIZATION, LUMP SUM 0.74; FIELD OFFICE TYPE D, EACH 0.74; CLEARING & GRUBBING, LUMP SUM 0.57; CLEARING, TREE 2.00; GRUBBING, TREE 2.00; FORCE SEWER MAIN HANGER SYSTEM, LUMP SUM 1.00; REMOVE CONCRETE STEPS, EACH 1.00; REMOVE MAIL BOX SUPPORT, EACH 3.00; SALVAGE SIGN, EACH 23.00; SAWING BIT PAVEMENT (FULL DEPTH), LIN FT 316.00; REMOVE PIPE CULVERTS, LIN FT 134.00; REMOVE SEWER PIPE (STORM), LIN FT 172.00; REMOVE CURB & GUTTER, LIN FT 220.00; REMOVE CHAIN LINK FENCE, LIN FT 342.00; REMOVE GUARDRAIL-PLATE BEAM, LIN FT 417.00; REMOVE BITUMINOUS PAVEMENT, SQ YD 4,933.00; REMOVE BITUMINOUS WALK, SQ FT 1,782.00; REMOVE CONCRETE MEDIAN, SQ FT 665.00; REMOVE REGULATED WASTE MATERIAL (BRIDGE), LUMP SUM 1.00; GEOTEXTILE FABRIC TYPE 6, SQ YD 8,142.00; DEWATERING, LUMP SUM 1.00; TEMPORARY ROAD, LUMP SUM 1.00; EXCAVATION - COMMON(P), CU YD 4,897.00; SELECT GRANULAR EMBANKMENT MOD 7% (CV)(P), CU YD 3,881.00; AGGREGATE BASE (CV) CLASS 5(P), CU YD 1,431.00; BITUMINOUS PATCHING MIXTURE 1, SQ YD 25.00; DRILL & GROUT REINF BAR (EPOXY COATED), EACH 6.00; TYPE SP 12.5 WEARING COURSE MIX (3;C), TON 1,488.00; TYPE SP 9.5 BIT MIXTURE FOR ENTRANCES (3,C), TON 120.00; TYPE MOD P-1 BARRIER CONC (3S52)(P), LIN FT 185.00; TYPE MOD P-2 (TL-4) BARRIER CONC (3S52)(P), LIN FT 179.00; STRUCTURE EXCAVATION CLASS R, CU YD 100.00; STRUCTURAL CONCRETE (1G52)(P), CU YD 243.00; STRUCTURAL CONCRETE (1P62), CU YD 89.00; STRUCTURAL CONCRETE (3B52)(P), CU YD 301.00; REINFORCEMENT BARS(P), POUND 16,060.00; REINFORCEMENT BARS (EPOXY COATED)(P), POUND 96,110.00; REINFORCEMENT BARS (STAINLESS-75KSI)(P), POUND 760.00; STRUCTURE EXCAVATION, LUMP SUM 1.0