Specifications include, but are not limited to: MOBILIZATION, LUMP SUM 1.00; FIELD OFFICE TYPE D, EACH 1.00; CLEARING & GRUBBING, LUMP SUM 1.00; REMOVE BARBED WIRE FENCE, LIN FT 240.00; DEWATERING, LUMP SUM 1.00; TEMPORARY STREAM DIVERSION SYSTEM, LUMP SUM 1.00; GEOTEXTILE FABRIC TYPE VI, SQ YD 1,214.00; SELECT GRANULAR EMBANKMENT (CV)(P), CU YD 1,449.00; EXCAVATION - COMMON(P), CU YD 286.00; GRANULAR EMBANKMENT (CV)(P), CU YD 597.00; AGGREGATE SURFACING (CV) CLASS 5(P), CU YD 786.00; BITUMINOUS MATERIAL FOR SHOULDER TACK, GALLON 66.00; 12X9 PRECAST CONCRETE BOX CULV END SECT, EACH 2.00; 12X9 PRECAST CONCRETE BOX CULVERT, LIN FT 56.00; REMOVE EXISTING BRIDGE, LUMP SUM 1.00; COARSE AGGREGATE BEDDING (CV)(P), CU YD 160.00; INSTALL CULVERT MARKER, EACH 4.00; 66” SPAN CAS PIPE-ARCH APRON, EACH 4.00; 66” SPAN CAS PIPE-ARCH CULVERT, LIN FT 118.00; CULVERT EXCAVATION CLASS U(P), CU YD 1,653.00; RANDOM RIPRAP CLASS III, CU YD 34.00; TRAFFIC CONTROL, LUMP SUM 1.00; EROSION CONTROL SUPERVISOR, LUMP SUM 1.00; SILT FENCE; TYPE HI, LIN FT 1,305.00; COMMON TOPSOIL BORROW, CU YD 289.00; FERTILIZER TYPE 3, POUND 238.00; EROSION CONTROL BLANKETS CATEGORY 3N, SQ YD 3,582.00; SEEDING, ACRE 0.68; SEED MIXTURE 25-141, POUND 40.00; RAPID STABILIZATION METHOD 3, M GALLON 8.20.