Specifications include, but are not limited to: QUALITY MANAGEMENT, LUMP SUM 3.00; MOBILIZATION, LUMP SUM 5.00; REMOVE CONCRETE APRON, EACH 3.00; SALVAGE CONCRETE APRON, EACH 3.00; SAWING BIT PAVEMENT (FULL DEPTH), LIN FT 2,276.00; REMOVE PIPE CULVERTS, LIN FT 382.00; REMOVE BITUMINOUS PAVEMENT, SQ YD 36,569.00; TEMPORARY STREAM DIVERSION SYSTEM, LUMP SUM 2.00; TEMPORARY STREAM DIVERSION SYSTEM, EACH 1.00; AGGREGATE SURFACING CLASS 5, TON 4,382.00; RECYCLED AGGREGATE SURFACING, TON 518.00; RECYCLED AGGREGATE SURFACING, TON 2,253.00; MOTOR GRADER, HOUR 131.00; 0.5 CU YD SHOVEL, HOUR 54.00; 12 CU YD TRUCK, HOUR 54.00; 4.0 CU YD FRONT END LOADER, HOUR 54.00; 8 TON STEEL-WHEELED ROLLER, HOUR 131.00; WATER, M GALLON 263.00; CALCIUM CHLORIDE SOLUTION, GALLON 14,070.00; AGGREGATE BASE (CV) CLASS 5(P), CU YD 124.00; AGGREGATE BASE CLASS 5, TON 2,029.00; FULL DEPTH RECLAMATION, SQ YD 91,557.00; BASE STABILIZATION (BASE ONE), SQ YD 15,102.00; BASE STABILIZATION (BASE ONE), SQ YD 73,894.00; MILL BITUMINOUS SURFACE (4.0"), SQ YD 16,946.00