Specifications include, but are not limited to: QUALITY MANAGEMENT, LUMP SUM 1.00; MOBILIZATION, LUMP SUM 1.00; SAWING BIT PAVEMENT (FULL DEPTH), LIN FT 105.00; AGGREGATE SURFACING CLASS 5, TON 1,019.00; MOTOR GRADER, HOUR 40.00; 0.5 CU YD SHOVEL, HOUR 20.00; 8 TON STEEL-WHEELED ROLLER, HOUR 40.00; WATER, M GALLON 136.00; AGGREGATE BASE CLASS 5, TON 1,117.00; AGGREGATE BASE STABILIZATION, SQ YD 32,124.00; FULL DEPTH RECLAMATION, SQ YD 32,124.00; BITUMINOUS MATERIAL FOR TACK COAT, GALLON 1,569.00; TYPE SP 9.5 WEARING COURSE MIX (2;C), TON 2,490.00; TYPE SP 12.5 WEARING COURSE MIX (2;C), TON 3,585.00; MAIL BOX SUPPORT, EACH 20.00; TRAFFIC CONTROL, LUMP SUM 1.00; INTERIM PAVEMENT MARKING, LIN FT 40,680.00; 6" SOLID LINE MULTI COMP, LIN FT 16,940.00; 4" DBLE SOLID LINE MULTI COMP, LIN FT 10,170.00; 24" SOLID LINE PREF TAPE GR IN, LIN FT 24.00; PAVT MSSG PREF TAPE GR IN, SQ FT 49.02