Contractor shall supply lump sum cost to provide materials and labor for installation of a black coated chain link fence as follows in the base bid. 1. Contractor shall supply and install a chain link fence around the perimeter of the yard per the provided layout. Approximate fence perimeter totals 238 lineal ft. Contractor shall include 270 lineal 6’ ft of fence in their base bid and a 6’ wide gate. Unit cost per ft to install shall be provided in Bid Alternate #1 and will be used to calculate add or deduct based on actual install. See following product specifications. 2. Fence shall start at the left right corner of the house and run straight across for 25’ to the tree/ brush line of the yard; then run along the maintained side and rear yard areas measuring approximately 55’ (left side), 85’ (Rear) & 55’ (right side); then turn and run 18’ straight to the front right side of the garage. Install a 6’ wide gate centered on the front facing section of fence to the right side of the garage. Fence shall not be placed any closer to the street than the front wall of the garage. (Fence will follow perimeter of existing yard. Thus no large trees are planned for removal. A rough layout of the proposed fence has been provided for reference.) a. Fence on the left side of the house shall start approx. 1’ to 2’ past the concrete splash pad and downspout located at that corner of the house. b. Fence on the right side of the garage shall start approx. 1’ to 2’ in front of the concrete splash pad and downspout located at the rear corner of the garage. 3. Contractor shall remove all small trees, brush, overhanging branches and shrubs necessary to install the fence. 4. Contractor shall include the cost of any digging or other land alterations required to install fence.