Specifications include, but are not limited to: Contractor to supply all pipe, fittings, insulation and materials needed for install. Tool control and access control will be enforced. Intercept DCW supply to dish machine and re-pipe to new softener location. Install new pipe downstream of the softener to supply the dish machine with softened DCW. Pipe size shall be 1” copper. Piping shall be concealed in ceiling cavity and professionally insulated. Dish room is a hard lid with access through exiting fixtures. Install softener, accessories, and drain piping. Provide all pipe, valves, fittings, to connect to existing dish machine cold water supply above hard lid ceiling of dish room. Softener to soften cold water supply to dish machine only. Penetration of dining room wall / seal included. Plumbing pipe insulation of new piping as required.