1 2104.502 Remove Hydrant Each 1 0.0 2 2104.502 Remove Manhole Each 61 0.0 3 2104.502 Remove Valve Box Each 1 0.0 4 2104.503 Remove Curb and Gutter Linear Foot 470 0.0 5 2104.504 Remove Concrete Walk Square Yard 18 0.0 6 2504.602 Install Hydrant Each 1 0.0 7 2504.602 Connect to Existing Water Main Each 184 0.0 8 2504.602 Install 6" Gate Valve Each 34 0.0 9 2504.602 Install 8" Gate Valve Each 7 0.0 10 2504.602 Install 12" Gate Valve Each 1 0.0 11 2504.602 Install 16" Gate Valve Each 1 0.0 12 2504.602 Install Valve Box Each 2 0.0 13 2504.602 Manhole (Water) Each 39 0.0 14 2504.602 Water Utility Hole Each 247 0.0 15 2504.603 6” Cast Iron Water Main Cleaned and Lined Linear Foot 72,174 0.0 16 2504.603 8” Cast Iron Water Main Cleaned and Lined Linear Foot 13,292 0.0 17 2504.603 12” Cast Iron Water Main Cleaned and Lined Linear Foot 100 0.0 18 2504.603 16” Cast Iron Water Main Cleaned and Lined Linear Foot 100 0.0 19 2504.603 6" Epoxy Class 3 Cleaned and Lined Linear Foot 821 0.0 20 2504.603 8" Epoxy Class 3 Cleaned and Lined Linear Foot 100 0.0 21 2504.603 12" Epoxy Class 3 Cleaned and Lined Linear Foot 100 0.0 22 2504.603 16" Epoxy Class 3 Cleaned and Lined Linear Foot 100 0.0 23 2211.507 Select Granular Backfill Cubic Yard 30 0.0