MnDOT requests proposals for a phased contract including geometric layout and 30% plan completion (Phase 1) with potential of adding final design (Phase 2). The project Area is located on Trunk Highway (TH) 371 from the south unction with TH 200 to the City of Walker. This project will consist of a reclaim, with reconstruct segments where large changes to the profile are made, two new roundabouts, replacement of roadside infrastructure in poor condition, a center buffer zone or a Two Way Left Turn Lane through the whole road segment, and a new trail segment. Roadway widening will be required to accommodate the addition of the buffer zone and extend the Two Way Left Turn Lane. The primary goal of this project is to utilize alternatives identified from a previous TH 371 corridor study to arrive at an approved layout and 30% plan completion (Phase 1)