DEMO 1. Demo wall between existing meet rm 2 & meet rm 4 to create meet rm 3. 2. Demo wing wall & toilet at existing jail holding cell for new lactation room. 3. Demo existing carpet and base, prepping the space for new carpet in all of the gray area noted on the attached area layout. 4. Demo window and glass between lobby area and classroom for wall infill that will house a 60” tv with data cable and electrical ran to it. 5. New door opening will be added to enter the classroom. 6. Demo 2 existing paper organizer machines in the classroom area and pay for all costs associated with disposing of them. 7. Salvage existing drop box between lobby and classroom relocating it to the clerical area. 8. Remove existing door at the detainee holding cell (New lactation room) add new wood door with lite kit and hardware as specified in item e.1. 9. Demo existing wall and ceiling coverings in the jail holding cell. d. CASEWORK 1. Salvage existing base & upper cabinets from the South wall of the Copy/Mail Room, relocating them to the Lactation Room. 2. Salvage existing base and upper cabinets in the southern part of the classroom, relocating them to them to the Copy/Mail Room. 3. Salvage 1 existing open base cabinet, relocating it to the Receptionist area for supporting the drop box. 4. Salvage lobby countertop and cabinet base relocating it to under the lobby tv.