In the event snow falls or continues to fall throughout the day, the contractor must be available to do driving lanes, driveways, or full site cleanup if called to do so. If this is needed the District will contact the contractor. The contractor must have all loading dock areas, parking lots, paved trails, and asphalt playgrounds cleared (1” or less of accumulation) by 6:00 A.M. In the event of continuing snowfall, removal will continue until the site is clear or the building supervisor, or site and grounds supervisor agree the sites are safe. The snow removal contractor may be recalled for additional snow removal if the site becomes unsafe. Sites may need to be plowed for the safe start of school or for other events including athletic events, church services, and community activities during a snow event. This means more than one plowing may be necessary for the same snow event and will not be billed as a separate event. Move snow from parking lots to be pre-designated remote location to prevent ends of parking rows from being covered by mounds of snow. This process may be done by using a loader and dump truck, or comparable method, to ensure safe and timely removal. This snow must be placed at locations noted on the attached maps. Loss of parking spaces due to mounds of snow will not be permitted and no snow shall be piled in end caps where parking lot cross traffic will be impaired.