1. Review accompanying MRG Repair Plan PDF 2. Install closure and detour signage. 3. Install silt fence down gradient of any exposed or disturbed soils, two rows of silt fence at the base of the repair area, and a floating silt curtain spanning the length of the project for the duration of the project. 4. Remove chain link fencing as required and salvage for reuse. 5. Remove bituminous trails as required. County to replace bituminous trail after slope stabilization work has been completed. 6. Import satisfactory soils per the specifications, compact the soils per the specifications and grade the slope matching the existing contours. 7. Install Turf Replacement Mat (Trinet Recyclex or approved equal MNDOT Category 70) and fill with MNDOT 3877-3C topsoil per the manufacturer’s recommendations. 8. Staple TRM using Gripple TL-TA1 12” Twist Pins or approved equal. 9. Seed disturbed areas with MNDOT Patch Mix (PM) at a rate of 60 lbs/acre and a winter wheat cover crop seeded at 100 lbs/acre. 10. Install erosion control blanket(AEC Premier.Coco FibreNet) or approved equal MNDOT Category 30) on all disturbed areas. 11. Install biorolls along the slope at three locations as specified in the repair plan. 12. Install salvaged chain link fencing.