Specifications include, but are not limited to: The project is currently funded as described above with the goal of the schematic design package completed by December 8, 2023 (or earlier). The project encompasses a continuation of design, construction, and equipping required to upgrade the physical security elements and systems for the Capitol Mall and the buildings listed below, their attached tunnel systems, their surrounding grounds, and parking facilities as identified in the 2017 Minnesota State Capitol Complex Physical Security Predesign completed by Miller Dunwiddie with 2022 updates. Work includes but is not limited to the installation of bollards, blast protection, infrastructure security screen walls, door access controls, emergency call stations, security kiosks, locking devices, and traffic and crowd control devices. Per the appropriation language the following sixteen (16) structures and their sites, tunnels, or associated areas: 1. Administration Building, 50 Sherburne Avenue, Saint Paul, MN 55155 2. Ag/Health Laboratory Building, 601 North Robert Street, Saint Paul, MN 55164 3. Capitol Building, 75 Rev Dr Martin Luther King Jr Boulevard, Saint Paul, MN 55155 4. Centennial Office Building, 658 Cedar Street, Saint Paul, MN 55106 5. Governor’s Residence, 1006 Summit Avenue, Saint Paul, MN 55105 (Not included with this project) 6. Judicial Center, 25 Rev. Dr. Martin Luther King Jr. Blvd, Saint Paul, MN 55155 7. Minnesota History Center, 345 Kellogg Boulevard, Saint Paul, MN 55102 8. Power Plant and Shops, 691 North Robert Street, Saint Paul, MN 55101 9. Stassen Building, 600 North Robert Street, Saint Paul, MN 55146 10. State Office Building, 100 Rev. Dr. Martin Luther King Jr. Blvd, Saint Paul, MN 55155