All equipment & materials shall be installed according to the manufacturer’s installation instructions. o All equipment & materials shall be installed according to the UL or other listing standards. o For projects involving phasing, building materials including plumbing, mechanical, electrical and life-safety must be consistent (identical manufacturer and model) throughout all phases, unless poor performance of a product is identified and Facilities Management Division (FMD) requests a change order. o A copy or original of all permits pulled for construction and remodeling projects will be included in close out documents. Signed for completion. o Any masonry or concrete core drilling, cutting, excavating, etc. must be preceded by x-ray or approved alternate method. o Janitor closet/storage door sizes should be 4’ wide minimum. o Require Draw downs and paint codes o Zero VOC paint o Utilize Existing Paint Standards Provided by FMD. o Janitor closets minimum size is 110 SqFT per floor or 1 closet per 50,000 SqFT of building area, near freight elevator. o Janitor storage of 500 SqFT – 60”x 80” clear opening o Janitor equipment charging room required - 140 SqFT minimum - 60”x 80” clear opening – requires exhaust and outlets at 36” high every 24” around walls – adequate circuiting for loads being served plus 25% for expansion. o Janitorial Office 100 SqFT minimum o Janitor closet mop basins shall be floor type composite, Chicago faucet (chrome with vacuum breaker) with pail hook, wall support, and integralstops. o Floor drains required in all janitor closets. o Floor drains required in all cleaning equipment storage rooms. o 3 - Wall mounted mop hangers above sink o Shelving – adjustable metal standards and horizontal supports with composite wood shelving – for both Janitorial and Plant Maintenance Engineer (PME) storage spaces o Personal lockers for janitorial staff o Janitorial spaces such as equipment storage/charging, lockers, located adjacent to loading dock