Description: The Work of this Contract includes the furnishing of all labor and material for the construction of: • Replacement of electrical switchboard, panels, and various electrical appurtenances. • Installation of temporary bypass pumping system. • Replacement of pump guiderails, base elbow, and other pump appurtenances. • Removal of existing pump appurtenances and replacement in new, designated location. • Replacement of existing pump access hatches with larger access hatches. • Replacement of wet well piping and valves. • Replacement of valve vault piping and valves. • Installation of HVAC equipment for NFPA 820 compliance. • Demolition of existing diversion structure and installation of new diversion plate. • Installation of concrete baffle walls in wet well, surrounding pump. • Prep and paint walls, floors, interior doors, exterior doors, conduits, and ceilings in valve vault, control room, and generator room. • Prep and paint all process piping and pumping system appurtenances in wet well and valve vault. • Prep and paint all structural beams in wet well.