Full equipment HVAC & Furnace / A-C Replacement: 1. Demo, disconnect, removal and disposal of existing heating and air conditioning equipment. 2. Lineset from indoor coil to outdoor condensing unit will be replaced with new. 3. Condensate pump removal and replacement. 4. Disconnect sheet metal transition and replace with new custom transition for furnace and air conditioning. 5. All electrical requirements per code. Confirm breaker amp capacity and provide as required for the new equipment. Wire guage,electrical disconnect, reconnection or complete replacement of electrical whip is required. 6. City of Minneapolis Permits and Inspections. All HVAC work must be permitted and inspected according to State, Local and or City Codes. 7. Job-site must be maintained in a safe and organized fashion. 8. Provide approximately 2 tons of Air Conditioning with new equipment that includes a minimum 10 year warranty on materials and 2-3 year Labor Warranty. Include the WARRANTY DETAILS. 9. Provide and install new Furnace with approximately 60,000 BTU new equipment. Provide all manufacturer and model numbers as part of Proposal. Include sizing of HVAC Equipment to meet Minneapolis Code. 10. Provide and install a (7) day programmable thermostat...