1. Provide labor to remove existing dental equipment from the dental space including two dental chairs, two rear consoles and center divider console. Disconnect all utilities. Store equipment on site per Owner direction. 2. Utilize Owner Vendor provided equipment templates to locate new underground utilities to be moved and modified, including water supply, air, vacuum, N20, O2 and electrical receptacles. Plumbing subcontractor must have medical gas certification. Coordinate with Owner’s Dental Supplier as needed for precise layout. 3. Provide temporary protection as needed to maintain a clean building environment. Utilize dust containment equipment to contain dust. 4. Contractor may utilize the rear parking area for staging, dumpsters, toilet, etc. Contractor shall protect the rear hall flooring and clean the area daily. 5. Layout and cut existing concrete floor slab to accommodate the underground utilities modifications to the new chair locations. Coordinate this work with Owner staff to be performed during off business hours. 6. Patch concrete floor areas disturbed. Remove remaining floor coverings and cove base in the dental space and grind surfaces clean for new flooring installation. 7. Install new LVT and 4” vinyl wall base throughout the space. LVT: Shaw Contract Solitude 6”x48” plank fully adhered. Provide samples to Owner for color selection. 8. Modify electrical receptacles and low voltage connections for new equipment locations. 9. Selectively demo finished wall spaces and install backing support, electrical modifications, etc. for dental equipment installation. Restore drywall finishes. Install ceiling backer as needed for ceiling mounted computer monitor equipment. 10.Remove interior signage, wall attached accessories, etc. Remove vinyl wall covering, patch, skimcoat and paint all drywall surfaces within the dental space. Re-install wall mounted accessories and signage. 11.Provide and install custom casework base cabinet as shown in operatory 145. 12.Remove lower interior window sills (2). Cut down or install new matching window sill to be flush with the under sill trim. 13.Provide and install ceiling track mounted medica