The Project consists of the comprehensive demolition of the two-story brick and block structures at 402, 410, and 416 East Howard Street as well as surface demolition at 408 East Howard Street. A bid alternate is also included for comprehensive demolition of the 507 E Howard parcel while maintaining the integrity and safe operation of the adjacent parcel, which shares a wall. Provide a weather tight roof termination and wall condition to prevent thermal and moisture intrusion following the removal of the building. Identified hazardous materials within the structures shall be handled and disposed of in accordance with all applicable environmental and safety regulations. Structure foundations shall be removed to one foot below grade and subsequently backfilled while all surficial elements and existing utility services shall be fully removed to the property line. Final restoration will include the placement of topsoil and seeding to promote natural regrowth and prepare the site for future use.