Hinckley Storage Garage Addition: Meshakwad Community Center; 38043 Hinckley Rd., Hinckley, MN 55037. 1. Remove and protect dumpster enclosure for re-installation. Demo dumpster slab and concrete apron section in front of the dumpster pad. 2. Scrape existing topsoil and prepare site and construct thickened edge slab supported storage garage addition structure per plan and specification. 3. Import clean granular fill as needed to establish the floor slab at a matching elevation to the existing garage. Utilize existing topsoil to establish exterior final grade around the addition to a smooth finish. Seed area upon completion of final grading operations. 4. Frame the new garage addition to plan. Remove existing roofing as needed to tie-in the new roof to the existing structure. 5. Extend electrical service into the new addition space from the existing 60 amp subpanel. 6. Steel roofing to be Metal Sales Image II concealed fastened 26ga. 16” panel coverage with High Temperature synthetic underlayment. Contractor shall be responsible for trim and accessories to ensure compliance with manufacturer installation requirements. Include Fascia trim and ventilated ridge cap and soffit materials. Match existing structure colors. 7. Install WRB and steel siding to be Metal Sales EM1-1212 Wall Panel Empire Series concealed fastener system. Contractor hall be responsible for trim and accessories to ensure compliance with manufacturer installation requirements. Match existing structure colors. 8. Overhead garage door: Midland Commercial Ribbed CS24 16’ x 8’. With opener per spec book. Match existing color. 9. Install snow guards on the front (South) elevation. Install gutter and downspout to the addition front (South Wall Line) Down spout to discharge at the east end. Install downspout extension to discharge behind the dumpster pad. 10.Interior lighting to consist of ceramic fixture base. Provide and install 60watt equivalent LED light bulbs. Add Exterior wall pack lighting: Patriot 9748-BK3 or equal dusk to dawn LED security light to the East Side of the new overhead door. 11.Modify existing garage East wall by adding a 60” opening. Remove foundation block and grind clean to floor. Install header, trimmer studs, cripple studs as needed to create the opening. Install continuous aluminum threshold plate to cover joint. 12.Form and pour new 5” concrete dumpster pad. 13.Install 5” reinforced concrete apron full width of the garage addition and dumpster pad to existing road 10’ existing setback. Dowel connection to existing apron. 14.Re-install previously removed dumpster fence enclosure in the same configuration. Lake Lena Storage Garage: Lake Lena Community Center; 45749 Grace Lake Rd., Sandstone, MN 55072. 1. Demo existing old playground equipment from the construction area. 2. Scrape existing topsoil and prepare site and construct thickened edge slab supported storage garage structure per plan and specification. 3. Import clean granular fill as needed to establish the floor slab elevation. Place and compact. Utilize existing topsoil to establish exterior final grade around the addition to a smooth finish. Seed area upon completion of final grading operations. Remove excess topsoil materials from the site. 4. Construct the new garage to plan. 5. Extend electrical service into the new garage space from the existing electrical service. Provide and install 60 amp sub panel. 6. Steel roofing to be Elevate (Firestone) Una-Clad UC-4 concealed fastened 26ga. 16” panel coverage with High Temperature synthetic underlayment. Contractor shall be responsible for trim and accessories to ensure compliance with manufacturer installation requirements. Include Fascia trim, ventilated ridge and soffit materials. Match existing community center structure colors. 7. Install WRB and EIFS siding to match the existing community center structure. 8. Overhead garage door: Midland Commercial Ribbed CS24 16’ x 8’ white with opener per spec book. 9. Install ceiling vapor barrier and 5/8” type x drywall ceiling. (fire tape: level-1 finish) 10.Interior lighting to consist of ceramic fixture base. Provide and install 60watt equivalent LED light bulbs. Add Exterior wall pack lighting: Patriot 9748-BK3 or equal dusk to dawn LED security light to the South gable above overhead door. 11.Install 5” reinforced concrete apron full width of the garage addition x 10’, tapered connecting to the existing parking lot asphalt at 16’ width. Include ½% TERO tax in base bid. Davis Bacon wage rates apply. They will be posted with Pre-Bid Addendum #1. Hinckley site will require MLBO and City of Hinckley building permits. Lake Lena site will require MLBO building permit. Contractor will need to provide toilet facilities. Contractor is responsible for site cleanup and disposal of generated debris.