1. Complete the release work as indicated on the individual site Project Proposals provided by the Project Supervisors. The specifications indicated on the Project Proposals are part of the contract requirements. Review them carefully. 2. Work may not be done if there is more than 3 inches of snow cover in the site. 3. Sever all competing stems within 4" of the ground, unless otherwise specified based on project, and below all live branches. 4. Keep all severed brush, trees, branches, etc. as low to the ground as possible, off crop trees, and at least 20 feet from all maintained roads. 5. Refer to individual project proposals for specific details on crop trees and reserve trees. Reserve species or areas as directed by the project supervisor. 6. Keep all roads and trails on the sites open and not blocked with trees, branches, vehicles, or debris resulting from this operation. 7. No felling of stems into wetlands or onto private land.