DUMPSTERS: The Project Supervisor may request an increase or decrease in the number of dumpsters/containers or the frequency of pickup service. A. Placement location for the dumpsters/containers at the site can be found on the included site map. B. The volume of waste to be collected is unknown. C. Dumpsters/Containers must be in good condition without holes so that contents will not spill onto the ground at the sites or during transportation. Dumpsters may be lined at the contractor’s discretion. D. All dumpsters/containers must have covers. E. Service of the dumpsters/containers shall include loading, hauling and disposal. F. Dumpsters/Containers will be serviced on a weekly basis. Occasional on-call service might be required during contract period, in addition to the weekly service (Contract vendor must supply contact information for requesting service). DNR staff will call the Contract Vendor to request collections. Contract vendor shall perform on-call pickups within 24 hours of call. G. Dumpsters/Containers must meet all state and local safety codes. H. Dumpsters/Containers must be acceptable in appearance to Project Supervisor. I. Contractor shall keep dumpster/container in good repair or replace it at the request of the Project Supervisor. J. The State of Minnesota accepts no responsibility for the containers. REFUSE SERVICE: A. It is understood that the per pickup price bid includes all cost for labor, materials, equipment, tools, transportation, service, disposal fee, weight fees, fuel surcharges, assessments and all else necessary to complete the service described in these specifications. All fees must be included in the price per pickup, except the MN Commercial Solid Waste Fee and other County taxes (if applicable). (Vendor may quote an optional per ton rate for volume of disposal material). B. If any scheduled collection day falls on an observed holiday, the contract vendor shall notify the DNR staff and an alternate collection day will be arranged. C. Extra or less frequent pickups may be required by the Project Supervisor. Any pickups beyond those scheduled shall be invoiced at the same rate as the original bid price. DNR staff will call the Contract Vendor to request collection changes. D. DNR will only pay for actual services rendered. E. Garbage immediately adjacent to dumpsters/containers will be cleaned up and disposed of by contractor.