GENERAL SPECIFICATIONS: Vendor will manage all aspects of service coordination, vendor management, inspection performance, corrective action tracing and compliance documentation. Work to be performed according to applicable code requirements. Inspection documents will be provided within 30 days of inspection completion. EQUIPMENT WARRANTY, RECALLS, AND SERVICE UPDATES The Contract Vendor shall be responsible for the cost of any inspections, adjustments, parts, labor, Travel, pickup and/or delivery charges that are a result of equipment failure(s) prior to or during the warranty period. The Contract Vendor shall be the single contact through which Customers arrange warranty work. All warranty work must be done with the State of Minnesota unless mutually agreed by the Customer and the Contract Vendor. The warranty work shall be performed as soon as possible within a reasonable amount of time. This warranty shall commence when the unit has been fully inspected upon delivery at the DNR and payment is approved. PARTS Line 1 in Swift Contract Vendor will supply parts to complete installation of Ansul LVS-3 liquid vehicle system for D2 Cat dozer • Qty 1 Ansul LVS 3 wet chemical cylinder & heavy duty bracket • Qty 1 Ansul LVS 3 cartridge & heavy duty bracket • Qty 1 Ansul 3 gallon pail LVS NF-40 (PFAS free wet chemical agent) • Qty 4 Wet chemical nozzles (Combination 9.5 & 9.5W) • Qty 4 Swivel nozzle assemblies • Qty 1 Pneumatic Manual Actuator • Qty 1 Threaded check valve • Qty 1 Safety vent relief for actuation line • Qty 1 Pressure switch for machine shutdown • Qty 1 20lb high flow stored pressure fire extinguisher & heavy duty bracket • Qty 1 Lot of hydraulic hose, crimps, hydraulic fittings, galvanized pipe 90, 45 & tee’s, ½” bulkheads, welding lugs & fyrejacketing for ¼” actuation lines. • Final ties to shutdowns wired by your mechanics