Remove erosion control mat, soil bed prep, and replant all GSI basins per plan. Removal/disposal of temporary erosion control mat in the basin areas • Remove and dispose of all Noxious Weeds and plantings. • Removal and disposal of any trash or debris collected in the project areas. • Pick up and dispose of used hypodermics needles meeting OSHA guidelines. • Backfill with rooting topsoil borrow and regrade areas. Including areas in the new steel planter beds and areas where Minneapolis Park and Recreation Board has planted new trees along this corridor. • Common Exc (3 inches) and Soil Bed Preparation. Including areas in the new steel planter beds and areas where Minneapolis Park and Recreation Board has planted new trees along this corridor. • Procure and install planting per plan. The plan shows a specific planting preference on each boulevard and to include Bee Lawn Mix, perennial plugs (per plan) , salt resistant sod, hydroseed with MnDOT 22-111 seed mix, or prep and leave bed bare. • Bee Lawn seed mix to be' hydraulically applied per MnDOT spec. 2575, including hydraulic mulch, and tackifier. • Provide establishment work to ensure the boulevards meet the following standards by o Contain 90% native vegetation coverage overall. o 10% or less weedy species within any 10 SF area o No bare areas > 1 SF o No Noxious Weeds. • Perform and provide inspection reports as specified in MNDOT 2571 until final acceptance by the Engineer (including the 21 month maintenance period). This inspection report is considered incidental to this contract. • Provide watering when directed by the Engineer, in the time between 30 days (initial acceptance) and 90 days (semi final acceptance) • Provide incidental costs for, weeding (including Noxious Weeds), mowing/weed whipping, plant replacement, and any other activity expected for establishment work.