Specifications include, but are not limited to:THE MAJOR ITEMS OF WORK ARE: 24" STOP LINE WHITE-POLY PREFORM-GROUND IN 29 L F , 6" CONCRETE DRIVEWAY PAVEMENT 595 S Y , 6" CONCRETE VALLEY GUTTER 39 S Y , ADJUST GATE VALVE 3 EACH , ADJUST HANDHOLE 11 EACH , AGGREGATE BASE (CV) CLASS 5 35 C Y , CASTING ASSEMBLY 12 EACH , COMMON EXCAVATION 10 C Y , CONCRETE CURB AND GUTTER 3729 L F , CONCRETE CURB DESIGN V 16 L F , CONCRETE MEDIAN 101 S Y , CONCRETE WALK 19434 S F , CONSTRUCTION SURVEYING 1 LS , CROSSWALK MARKING-POLY PREFORM-GROUND IN 3650 S F , EMERGENCY VEHICLE PREEMPTION SYSTEM 1 LS , INSTALL RETAINING WALL 19 L F , INSTALL SIGN 8 EACH , MILL AND PATCH BITUMINOUS PAVEMENT 3729 L F , MOBILIZATION 1 LS , PAVEMENT MARKING REMOVAL 1729 S F , REMOVE BITUMINOUS DRIVEWAY PAVEMENT 1061 S Y , REMOVE CASTING 12 EACH , REMOVE CONCRETE DRIVEWAY PAVEMENT 691 S Y , REMOVE CONCRETE GUTTER 115 L F , REMOVE CONCRETE MEDIAN 121 S Y , REMOVE CONCRETE WALK 18390 S F , REMOVE CURB AND GUTTER 3729 L F , REVISE SIGNAL SYSTEM A 1 SYS , REVISE SIGNAL SYSTEM B 1 SYS , REVISE SIGNAL SYSTEM C 1 SYS , REVISE SIGNAL SYSTEM D 1 SYS , RIGID PVC LOOP DETECTOR 6'X6' 22 EACH , SALVAGE RETAINING WALL 19 L F , SALVAGE SIGN 8 EACH , SAWING BITUMINOUS PAVEMENT (FULL DEPTH) 1118 L F , SITE RESTORATION 72 EACH , STORM DRAIN INLET PROTECTION 26 EACH , TEMPORARY PEDESTRIAN ACCESS CONTROL 1 LS , TRAFFIC CONTROL 1 LS , TRAFFIC CONTROL SIGNAL SYSTEM 1 SIGS , TRAFFIC CONTROL SUPERVISOR 1 LS , TRUNCATED DOMES 1119 S F , TYPE SP 9.5 WEARING COURSE MIXTURE (3,B) 359 TON