This project consists of trail pavement rehabilitation intended to improve the serviceability and ride quality of the shared multi-use paved trail within the city. (see enclosed map of the project area). The trail segments identified for work have experienced surface deficiencies primarily in the form of surface cracking and minor to major raveling. The trail pavement will require crack filing, asphalt removal and patching or infrared patching, and Star Road-Guard installation. An alternate quote shall be provided for the crackfilling and asphalt patching work. The trail segment is a component of the City of Monticello paved trail system, a heavily-used route for trail users of all recreation types: walking/hiking/running, dog-walking, biking, rollerblading, commuting, and roller skiing. For these reasons, the Contractor must pay careful attention to the requirements for safety, maintenance of traffic, and approved work times, as referenced throughout the Contract Documents. To maintain heavy trail traffic during the summer months, the Contractor will be required to place Star Road-Guard in specific trail Segments, allowing the trail to fully dry before moving onto the next Segment. The contractor shall only close the trail segment that is actively being worked on. The contractor shall submit to the City a schedule of the intended closure dates of the trail segments one week prior to commencing work to allow the City’s Communication Department to properly notify the public. The contractor shall not change the dates of closure once submitted (excluding delays due to weather related events). The contractor shall install temporary construction signage as necessary and as determined by the City. No substitutions will be allowed.