Unless otherwise noted all work shall be completed according to the 2025 MLB Spec Book. HVAC & Furnace / A-C Replacement: 1. Demo, disconnect, removal and disposal of existing Manufactured Home Gas Furnace by “Coleman Evcon”. This furnace is a model #DGAA070BDTA Serial #030812670 – a 56000 BTU natural gas furnace. The air conditioning equipment to be removed is a Lennox M/N HS29-024-5P Serial #5805H26675 with HCFC – 22 also known as R22. Include disconnect, removal and disposal costs in full. 2. Lineset from indoor coil to outdoor condensing unit needs replacement. 3. Disconnect sheet metal transition and replace with new custom transition for furnace and air conditioning. Provide any additional sheetmetal and or required duct work. 4. All electrical requirements per code. Confirm breaker amp capacity and provide as required for the new equipment. Wire guage,electrical disconnect, reconnection or complete replacement of electrical whip may be required. Verify at walk through or prior to your proposal. 5. MLBO Building Official requires MAKE-UP AIR to be sufficient. Direct all questions to Toby Egan (320-630-2491) for this requirement any other Permit requirements questions. A MLBO Permit must be secured. Your Manual S questions should be directed to Toby Egan (320-630- 2491). 6. Job-site must be maintained in a safe and organized fashion. 7. Provide NEW Furnace and Air Conditioning with Condenser (see models above), A Coil and Line Set for new equipment that includes a warranty. Include the WARRANTY DETAILS on your proposal. If considering bidding any other manufacturer, please contact us for approval and then provide alternate manufacturer to be shared with other bidders. 8. Provide and install new Furnace in accordance to approved Manual J and S Reports. Provide all manufacturer and model numbers as part of Proposal. 9. Provide and install a (2) stage; (7) day programmable thermostat in the approved location. 10. Include Pad for the condenser locate in the back yard. 11. Owner prefers original type equipment or approved substitutions. 12. Provide pricing for one or more equipment packages depending on your preferred equipment.