1. Provide materials and labor to demolish remaining debris on slab, including but not limited to sill plate and flooring; and have all debris disposed of off-site. Contractor must take care not to cause any damage to the concrete or remaining anchor bolts. 2. Provide materials and labor to demo and replace garage apron and sidewalk. Supply clean sand and prep base as needed. Ensure concrete matches elevations at all abutments. Include reinforcement per Spec Book and control joints no more than every 4’. Include an expansion joint at garage floor abutment. 3. Supply all materials, equipment and labor to reconstruct a new Blue Spruce Garage Left home. See plans and selection sheet for options. a. Supply and install screw-in anchor bolts as needed to replace those missing or damaged. Quick bolts will not be accepted. Ensure that bolts are long enough to meet code requirements. b. Furnace thermostat model to be installed will be Honeywell T6 Pro Series TH6210U2001. c. Contractor shall install Mid-America Mounting Blocks and Vents in Certainteed color specified. Mounting blocks shall be installed for all openings, j-channel will not be allowed to box any openings other than windows or doors. d. Contractor shall install #4 re-bar reinforcement @ 24” o.c. in exterior concrete. e. Supply and install all new plumbing throughout. Contractor may need to demo concrete floor to access underground plumbing if broken off too low to connect. Contractor shall supply materials and labor to patch concrete floor after reconnecting. f. Simpson H25 hurricane ties shall be installed at every roof truss, one at each end. g. For homes requiring a sump pump, pumps shall never discharge directly onto exterior concrete; and contractor shall include cost of 25’ extension for discharge with each installation. h. Dig down along the perimeter of the house slab to demo foundation insulation down 6” below final grade. Supply and install insulation to replace. i. On foundations, aluminum coil stock must be sufficient width to extend a minimum of 6” below final grade. j. Insulate wall cavities with Knauf Jet Stream Ultra Blowing Wool Insulation. k. Provide materials and labor to construct a 5’x5’ concrete pad 4” thick. Supply and install AC-Guard security cage model ACGUKIT with AC-Guard Top Bar and 2 locks to be anchored with ½”x 3” Red Head anchor sleeves to the 5’x5’ pad. l. Window openings will have sheetrock returns for side jambs and marble sills. See selection sheet. m. Supply and install Shaw Infinite 12 luxury vinyl plank flooring. Install per manufacture’s specifications. Color is listed on the selection sheet. n. Baseboards shall be white pvc colonial style. Supply and install wood baseshoe at the bottom of cabinets and bath vanity stained per selection sheet. o. Updated models: 1) Panasonic FV-05-11VKSL2 model, vented to the exterior. Include Condensation Module FV-CSVK1 2) Exterior light fixtures: Patriot Lighting Dualux Bronze LED dual head motion sensor exterior fixtures model: E9201BZ. 3) Whirlpool oven model# WFC150MOJW 4) Whirlpool refrigerator model# WRT311FZDW. 4. Landscaping and final site work will be conducted by the Owner. General Contractor responsible for rough grading of the site to within three (3) inches of final grade. Rough grade must divert runoff away from the home with no areas of ponding. All areas within lot disturbed by construction shall be addressed. a. Area to Received Rough Grade Further Defined: Any disturbed areas on the lot. When rough grade is complete, no areas should pond water with runoff directed away from the home. Contractor will be required to call Project Coordinator for inspection and approval of their rough grade finish. 5. Site Clearing: Contractor shall remove brush and trees within 20’ of home and garage perimeter.