Specifications include, but are not limited to: Pricing shall be provided for any single unit items such as Emergency Call Out and Trip Charges. An annual estimate of the number of these items shall be included in the pricing total. 3.Labor estimate to be used is 100 hours annually. The bidder shall provide the hourly rates for each labor type and an estimated number of hours with each type totaling 100 hours. 4.Material shall be estimated based on the size of the network and any anticipated or historical figures. This would include any cable, strand, mounting hardware and consumables required for maintenance of the network. 5.A final estimate based on all of the above items is required and will be listed in the Bid Proposal Form.