Specifications include, but are not limited to: Complete Phase 500, 600, and 700 services, with Phase 400 services as necessary, to produce plans, permit applications, and contract documents for the removal of the existing powerplant stack and various roof replacements – Newberry Correctional Facility (NCF), Newberry, MI. The Agency desires to remove an existing stack to below roof level that has been abandoned in place and perform roof replacement on the power house and adjacent hot water storage tank area between the power house and the neighboring building. The existing stack is allowing water into the building and has potential to cause damage to existing electrical equipment below. Many areas on the roof of the power house and hot water storage tank area need roof replacement, restoration, maintenance and/or repair. The roofs needing to be replaced are well past their recommended life expectancy. 1. Removal of the existing stack to be below roof level and properly capped and sealed. 2. Removal of existing roof curbs that are no longer in use shall be included. 3. Replacement of roof sections on the powerhouse and hot water storage tank area using black, 60 mill reinforced fully adhered EPDM to be used in the design.