Specifications include, but are not limited to: construction of an earthen cap using imported fill and topsoil over an area of approximately 104,200 square yards (i.e., 21.53 acres). Work shall also include, but is not limited to, the clearing, grubbing, removal of fencing, removal and repair of the vertical flood control wall, designated utility abandonment and selective structure adjustment, construction of storm sewer and associated catch basins and water level control structures, construction of a concrete sidewalk and gravel walk, construction of gabion walls and security fence, installation of boulder benches, as well as seeding and installation of site plantings, and other Work necessary to complete the Project.