Specifications include, but are not limited to: • Provide for the design, permitting, development, and construction of the Facility with minimal financial participation by the University • Construct and deliver a completed Project within 24-months following execution of a ground lease agreement • Develop, construct and operate a Facility that is cost effective, functional, efficient, and sustainable • Develop a rink that features NHL dimensions with an internal connection to the Tsongas Center. The connection should enable student athletes from the University Men’s Hockey Program in full equipment, including skates, to walk between their existing locker room and training facility in the Tsongas Center to the ice surface in the Facility. • Develop a Facility that is consistent with professional industry standards • Incorporate facility program elements that are found in basic single level ice rinks without the inclusion of unnecessary high-end features