Specifications include, but are not limited to: Project #1 – New 480V 200A Service OE143 1. Disconnect existing 480V service to robot cell. Existing service to be removed back to PP159. Includes circuit 1, 3, & 5. 2. Provide and install new 200A breaker for Substation B. Include premium time to complete shutdown to install breaker. Include relocation of existing breakers if required. 3. Provide and install new 200A 480V panel to be located in OE143 near the robot cell. Contractor to include breakers (40A and 100A) to power robot cell. 4. Provide and install new electrical feed from Substation B to new panel located in robot cell. Included is wiring, conduit, supports, hangers and all other required components. Contractor to size conduit and wire appropriately. 5. Provide and install new electrical feeds (40A & 100A) from new panel to robot cell. Included is wiring, conduit, supports, hangers and all other required components. Contractor to size conduit and wire appropriately.