Specifications include, but are not limited to: •The facility will consist of (2) combustion turbine generators (CTGs) in a combined cycle configuration, including (2) heat recovery steam generators (HRSGs) and (1) steam turbine-generator (STG). There will also be (1) CTG in simple-cycle mode. •The CTGs will fire pipeline quality natural gas as the fuel for start-up and normal operation. Bypass stacks and dampers will be provided for combustion turbine operation when the HRSGs or STG are unavailable, or when a lower MW generation is required. •All major equipment will be located indoors. •Fuel gas will be supplied from a new natural gas pipeline brought to the site and will require gas compressors to increase fuel gas pressure delivered to the CTGs. •The HRSGs will be multi-pressure units and may contain integral deaerators and high and low-pressure steam drums (TBD). The configuration of the HRSGs will include supplemental duct firing. •Demineralized water will be used for make-up to the steam cycle. It will be generated with a reverse osmosis water treatment system on-site, and mix-beds regenerated off-site.