Specifications include, but are not limited to: DTMB /Building Operations is requesting design and construction administration services (phase 100 through 700) to “white box” a space at the first floor. The space consist of two levels. The intent is to clean up the space ready for a future tenant. Type of tenant is not know at this time. Two unisex bathrooms to be added. Intent is repair ceilings, keep existing architectural features, add an exit in the back, demo offices as needed, keep ceramic tile flooring. The existing DTMB contract calls for reviews at 50% and 90% at each phase starting 100 and ending at 700. Since the scope is simple, design reviews meeting can be reduced to 4 and then one final meeting to review the front end.